Conte aos seus amigos sobre este item:
NEC4: Effective Preparation and Management of the Construction Programme Willis, Tim (Irwin Mitchell, UK)
NEC4: Effective Preparation and Management of the Construction Programme
Willis, Tim (Irwin Mitchell, UK)
NEC4: Effective Preparation and Management of the Construction Programme explains the critical role of the programme within the NEC4 suite of contracts, providing insight and guidance into NEC4 contract requirements and good practice in the preparation of planning the works and the programme.
138 pages
| Mídia | Livros Paperback Book (Livro de capa flexível e brochura) |
| Lançado | 14 de fevereiro de 2025 |
| ISBN13 | 9781836624813 |
| Editoras | Emerald Publishing Limited |
| Páginas | 140 |
| Dimensões | 248 × 171 × 12 mm · 262 g |